Cisco CX-FEIP-2TX= Installation and con?guration Dokumentacja Strona 103

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 493
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 102
1-63
Cisco ONS 15454 Installation and Operations Guide, R3.2
January 2005
Chapter 1 Hardware Installation
Ferrite Installation
Figure 1-43 Attaching ferrites to SMB/BNC connectors
Procedure: Attach Ferrites to Wire-Wrap Pin Fields
Use an oval ferrite TDK ZCAT1730-0730 and block ferrite Fair Rite 0443164151 for each pair of cables.
Figure 1-44 shows the suggested method for attaching ferrites to wire-wrap pin fields.
Step 1 Wrap the cables once around and through the block ferrites and pull the cables straight through the oval
ferrites.
Step 2 Place the oval ferrite as close to the wire-wrap pin field as possible and between the ONS 15454 and the
block ferrite as shown. The block ferrite should be within 5 to 6 inches of the wire-wrap pin field.
Figure 1-44 Attaching ferrites to wire-wrap pin fields
B
A
32089
B
A
32091
Przeglądanie stron 102
1 2 ... 98 99 100 101 102 103 104 105 106 107 108 ... 492 493

Komentarze do niniejszej Instrukcji

Brak uwag