Cisco CX-FEIP-1TX= Installation and con?guration Podręcznik Użytkownika Strona 380

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 379
Installing the IF and ground cables Chapter 5: Installation
5-58
phn-2513_004v000 (Oct 2012)
10
Clamp the bottom lug of the grounding cable to the supporting structure using
site approved methods.
Use a two-hole lug secured with fasteners in both holes. This provides better
protection than a single-hole lug.
Installing and grounding the IF cable at building entry
Perform this procedure to install and ground the IF at the building (or cabinet) entry point
(Figure 79).
Figure 79 Grounding at building entry
Przeglądanie stron 379
1 2 ... 375 376 377 378 379 380 381 382 383 384 385 ... 647 648

Komentarze do niniejszej Instrukcji

Brak uwag