Cisco 3750-48TS - Catalyst Switch - Stackable Dokumentacja Strona 21

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 26
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 20
21
Install the XENPAK Module and Connect to the Ports
Follow these steps to install a XENPAK module into the XENPAK module slot on the front panel of the
Catalyst 3750G-16TD switch:
See the “Verify Port Connectivity” section on page 20 for instructions on how to verify that the
XENPAK module ports have established a link to the external device.
Step 1
Remove the two Phillips-head
retaining screws from the XENPAK
module slot cover, and store them for
later use. Remove the cover.
Step 2
Align the XENPAK module with the
guide rails inside the module slot,
and slide the module into the slot
until the XENPAK faceplate is flush
with the switch faceplate.
Step 3
Secure the XENPAK module in place by tightening the two captive installation
screws. Do not overtighten the screws.
Step 4
Remove the rubber plugs from the XENPAK module ports and fiber-optic cable, and
store them for future use.
Step 5
Align the cable SC connector with
the XENPAK module connector, so
that transmit (TX) meets receive
(RX), and RX meets TX.
Catalyst 3750
series
1
Catalyst 3750
series
T
X
R
X
1
Rubber
plug
XENPAK
module
Catalyst 3750
series
TX
RX
1
XENPAK
module
Przeglądanie stron 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26

Komentarze do niniejszej Instrukcji

Brak uwag